{"id":26992,"date":"2025-11-04T13:49:08","date_gmt":"2025-11-04T13:49:08","guid":{"rendered":"https:\/\/timberfinance.ch\/member-event-site-visit-im-zelg-residential-development-uster\/"},"modified":"2025-11-04T13:49:08","modified_gmt":"2025-11-04T13:49:08","slug":"member-event-site-visit-im-zelg-residential-development-uster","status":"publish","type":"post","link":"https:\/\/timberfinance.ch\/en\/member-event-site-visit-im-zelg-residential-development-uster\/","title":{"rendered":"Member Event \u2013 Site Visit \u00abIm Zelg\u00bb Residential Development, Uster"},"content":{"rendered":"<h3 data-start=\"208\" data-end=\"292\">Autumn 2025 Member Event: Visit to the \u201cIm Zelg\u201d Residential Development, Uster<\/h3>\n<p data-start=\"294\" data-end=\"516\">On <strong data-start=\"297\" data-end=\"318\">13 November 2025<\/strong>, the Timber Finance Initiative invites its members, senior advisors and partners to visit the <strong data-start=\"435\" data-end=\"457\">\u201cIm Zelg\u201d residential development in Uster<\/strong> \u2013 a pioneering example of modern timber construction.<\/p>\n<p data-start=\"518\" data-end=\"777\">The project was realized by Rhomberg Bau AG, Renggli AG, and our sister company TS3 AG. The TS3 technology enables two-way spanning timber slabs without visible beams \u2013 an important innovation for multi-storey timber construction. <\/p>\n<p data-start=\"779\" data-end=\"1057\">Participants will gain exclusive insights into the project\u2019s planning and implementation and learn how timber construction makes a measurable contribution to climate impact. In addition to exciting project insights, the event offers the opportunity for networking over a casual catering. <\/p>\n<p data-start=\"1059\" data-end=\"1142\">\ud83d\udcc5 Date: Thursday, 13 November 2025<br data-start=\"1102\" data-end=\"1105\">\ud83d\udccd Location: Zelgstrasse, 8610 Uster<\/p>\n<p data-start=\"1144\" data-end=\"1167\"><a class=\"decorated-link\" href=\"https:\/\/www.renggli.swiss\/de\/ueber-uns\/events\/events\/besichtigung-wohnueberbauung-im-zelg-uster\/besichtigung-wohnueberbauung-im-zelg-uster-registrationsformular\/\" rel=\"noopener\" data-start=\"1147\" data-end=\"1165\" target=\"_blank\">To the registration<\/a><\/p>\n<p data-start=\"1169\" data-end=\"1376\">Program Overview<br data-start=\"1190\" data-end=\"1193\">09:30 \u2013 Arrival of guests<br data-start=\"1221\" data-end=\"1224\">10:00 \u2013 Welcome &amp; group division<br data-start=\"1262\" data-end=\"1265\">Following \u2013 Guided tours in small groups<br data-start=\"1309\" data-end=\"1312\">11:30 \u2013 Catering &amp; networking<br data-start=\"1341\" data-end=\"1344\">13:00 \u2013 End of event<\/p>\n<p data-start=\"1378\" data-end=\"1718\">Travel &amp; Practical Information<br data-start=\"1400\" data-end=\"1403\">We recommend travelling by public transport. The residential development is about a 10-minute walk from Uster train station or can be reached by bus line 816 to the stop \u201cUster, Will\u201d (2 minutes on foot). <br data-start=\"1628\" data-end=\"1631\">For those arriving by car, parking spaces are available within a 5\u201310-minute walking distance.<\/p>\n<p data-start=\"1720\" data-end=\"1881\">The visit will take place partly on the construction site \u2013 sturdy footwear and warm clothing are recommended. Helmets and safety vests will be provided on site. <\/p>\n","protected":false},"excerpt":{"rendered":"Autumn 2025 Member Event: Visit to the \u201cIm Zelg\u201d Residential Development, Uster On 13 November 2025, the Timber Finance Initiative invites its members, senior advisors and partners to visit the \u201cIm Zelg\u201d residential development in Uster \u2013 a pioneering example of modern timber construction. The project was realized by Rhomberg Bau AG, Renggli AG, and [&hellip;]","protected":false},"author":9,"featured_media":26985,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[231,179],"tags":[],"class_list":["post-26992","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-tf-initiative-en"],"_links":{"self":[{"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/posts\/26992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/comments?post=26992"}],"version-history":[{"count":0,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/posts\/26992\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/media\/26985"}],"wp:attachment":[{"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/media?parent=26992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/categories?post=26992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timberfinance.ch\/en\/wp-json\/wp\/v2\/tags?post=26992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}